When it comes to retic in Two Rocks, especially on an established property, you need to be ready for some serious digging and some hard yakka. As the suburb name suggests there is a lot of rock up there and sometimes you just have to go around what you can’t go through.

I did this job last week, installing a whole retic system – 200m of PVC –  to an established property. There were lots of roots and rocks to contend with but also some nice long sandy patches. Thankfully the faithful trencher didn’t let me down and I managed to get it all done in the day.

Without the trencher there would be 2-3 days of work in this one. I used a combination of MP rotators and precision nozzles to get it all done on 3 stations.