There is Always a Way
This week I went to do a job that involved connecting the rear retic (running off a tap) to the main system at the front. In doing the quote I noticed a thin 70ml channel down the side of the house where liquid limestone ended and the fence began.
I figured that with a thin trenching shovel we could get enough dirt out to lay pipe and wire…
That all made sense but I forgot to take into account the fence post right smack bang in the middle of that 70ml channel. I was about to go and see the client and apologise for an embarrassing mistake on my part, when I had another thought…
I learnt a while back that you can dig under anything if you are prepared to dig for long enough so I thought this looked like a chance to test that theory. Surely 600-700ml down the concrete for the fence post would end and I would be able to get under it?…
Sure enough after some careful digging with a shovel that only just fitted I was able to poke a piece of PVC thru and make a connection. Saved my butt and saved my client having to run her retic off the tap any longer.
1 Comment
“you can dig under anything if you are prepared to dig for long enough ” Haha that’s great! As long as you’re in it for the long haul…